|
BMW 3 series E30Since 1983-1994 of releaseRepair and car operation |
|
BMW E30 + 1. The maintenance instruction + 2. Maintenance service + 3. The engine + 4. Cooling system + 5. Heating and ventilation + 6. Fuel system + 7. An exhaust system + 8. Transmissions + 9. Coupling + 10. Brake system + 11. A running gear + 12. A body - 13. An electric equipment 13.1.2. Search of malfunctions 13.1.3. Safety locks 13.1.4. The relay 13.1.5. The breaker of indexes of turn / of the alarm system 13.1.6. Switches on a steering column 13.1.7. The ignition lock 13.1.8. The receiver 13.1.9. The aerial 13.1.10. A guard of devices 13.1.11. Payment SI (the maintenance service index) 13.1.12. Headlights – replacement of lamps 13.1.13. Adjustment of headlights 13.1.14. The headlight case 13.1.15. Replacement of lamps 13.1.16. The screen wiper electric motor 13.1.17. A heater of back glass 13.1.18. Safety pillows 13.1.19. Cruise-control system 13.1.20. The central locking system 13.1.21. Electric стелокподъемники + 13.2. Electroschemes + 14. A good advice |
13.1.11. Payment SI (the maintenance service index)
Nickel-kadmievye of the battery for a SI-payment food The payment provides inclusion of a light signal after fulfilment of certain run when there comes turn of service of this or that knot or the unit. The payment represents the onboard computer which memory eats from separate batteries recharged nickel-kadmievyh. Payment deenergizing is provided with the special device connected to a diagnostic socket. Battery working life – about 6 years after which it is necessary to replace it. Batteries are recharged from an onboard network of the car. For the term of operation temperature conditions, especially warmly strongly influence. At raised temperatures tightness of batteries and electrolits can be broken can get on a guard of devices. Malfunction of the auxiliary battery leads to infringement of indications of a part of devices – a tachometre and the temperature index, and also to increase of noise of the receiver and to impossibility of deenergizing of alarm lamps. Conclusions of batteries are soldered to a payment, therefore their replacement is expedient for executing in a workshop for what it is necessary to remove a guard of devices and a payment. The prevention
|
|