BMW 3 series E30

Since 1983-1994 of release

Repair and car operation



BMW E30
+ 1. The maintenance instruction
+ 2. Maintenance service
- 3. The engine
   + 3.1.2. Specifications
   - 3.2. Dismantle and engine major repairs
      3.2.2. Specifications
      3.2.3. Major repairs – the general instructions
      3.2.4. Compression check in engine cylinders
      3.2.5. Major repairs – broad-brush observations
      3.2.6. Diagnostics of the engine with the help вакууметра
      3.2.7. Major repairs – alternatives
      3.2.8. Dismantle of the power unit
      3.2.9. Removal and engine installation
      3.2.10. An order of dismantling of the engine
      3.2.11. Dismantling of a head of the block of cylinders
      3.2.12. Clearing and check of a head of cylinders and details клапанного the mechanism
      3.2.13. Repair of valves
      3.2.14. Assemblage of a head of the block of cylinders
      3.2.15. Removal of pistons and rods
      3.2.16. Dismantle коленвала
      3.2.17. An intermediate shaft (only engine M20)
      3.2.18. Clearing of the block of cylinders
      3.2.19. Check of a condition of the block of cylinders
      3.2.20. Хоннингование cylinders
      3.2.21. Check of a condition of pistons and rods
      3.2.22. Condition check коленвала
      3.2.23. Check radical and шатунных bearings
      3.2.24. An engine assembly order
      3.2.25. Installation of piston rings
      3.2.26. Installation of an intermediate shaft
      3.2.27. Installation коленвала and check of backlashes in radical bearings
      3.2.28. Installation of a back epiploon
      3.2.29. Installation of rods and pistons, check of backlashes in шатунных bearings
      3.2.30. Start-up of the engine after repair and обкатка
   + 3.3. An engine electric equipment
+ 4. Cooling system
+ 5. Heating and ventilation
+ 6. Fuel system
+ 7. An exhaust system
+ 8. Transmissions
+ 9. Coupling
+ 10. Brake system
+ 11. A running gear
+ 12. A body
+ 13. An electric equipment
+ 14. A good advice



3.2.26. Installation of an intermediate shaft
PERFORMANCE ORDER
1. Clear basic necks of a shaft and the plug, запрессованные in the block of cylinders.
2. Establish a shaft and tighten 2 bolts of a clamping flange. Further assemblage is carried out upside-down.